A DYNAMIC AND ORIGINAL RANGE OF 20 M² FOR SMALL FLOOR SPACES
STUDIO FROM - FROM 20 M²

With or without building permit
for a wooden chalet?
With an individual, a chalet is subject to common construction rights:
If the construction is installed for a period of less than 3 months, it is exempt from any formality
If the construction is installed for a period of more than 3 months and its Gross Work Area (SH OB) is less than 20 m2, a simple declaration is sufficient.
On the other hand, if its surface is greater than 20 m2, a building permit is required.
With or without building permit
for a wooden chalet?
With an individual, a chalet is subject to common construction rights:
If the construction is installed for a period of less than 3 months, it is exempt from any formality
If the construction is installed for a period of more than 3 months and its Gross Work Area (SH OB) is less than 20 m2, a simple declaration is sufficient.
On the other hand, if its surface is greater than 20 m2, a building permit is required.
.png)








